Category
Recently Viewed Products
-
JEDEC JEP119A
$74.00$44.40 -
JEDEC EIA 397
$228.00$136.80 -
ISPE Baseline Guide: Volume 1 - Active Pharmaceutical Ingredients (Second Edition)
$515.00$309.00 -
GAMP Good Practice Guide: Enabling Innovation
$595.00$357.00 -
GAMP Good Practice Guide: A Risk-Based Approach to Calibration Management, Second Edition
$460.00$276.00
ISPE Good Practice Guide: Development of Investigational Therapeutic Biological Products
$460.00 $276.00
Handbook / Manual / Guide by International Society for Pharmaceutical Engineering, 08/01/2007
With the rapid growth in the biopharmaceutical industry over the past two decades, the number of newly approved biological products has dramatically increased. In 2005, a record 21 biological products received US Food and Drug Administration (FDA) approvals, including therapies for the treatment of rheumatoid arthritis, diabetes, cancer, and rare genetic disorders.
With the increasing number of approved biological products on the global market come major challenges for many biopharmaceutical companies, especially during the critical process development and manufacturing stages of product development.
This Guide will consider the major issues that will confront a biopharmaceutical company in moving therapeutic biological products from the laboratory to the clinic and beyond. The Guide is intended to provide readers with an understanding of issues surrounding product and process development, manufacturing, investigational product supply chain management, quality control/quality assurance, and global regulatory requirements for biopharmaceuticals.
The intended audience for this Guide includes the following disciplines:
- Clinical Supply/Clinical Trial Materials
- Clinical Research
- Manufacturing
- Project Management
- Quality Assurance/Quality Control
- Regulatory Affairs
- Research and Development
The Guide specifically addresses the methods and challenges surrounding recombinant therapeutic biological product development, including considerations during its use in clinical trials.
It focuses on project planning/management, preclinical/clinical phases, comparability and bridging studies, Active Pharmaceutical Ingredient (API)/Drug Substance (DS)/Drug Product (DP)/placebo process development, manufacturing of DS/DP, process validation, supply chain management of biological investigational products for clinical trials, quality control/quality assurance considerations, and global regulatory strategies.
Product Details
- Published:
- 08/01/2007
- ISBN(s):
- 1931879583
- Number of Pages:
- 92
- File Size:
- 1 file , 1.8 MB
- Note:
- This product is unavailable in Russia, Belarus
Related products
-
ISPE Guide Series: Product Quality Lifecycle Implementation (PQLI) from Concept to Continual Improvement Part 4 – Process Performance and Product Quality Monitoring System
$410.00$246.00Add to cartHandbook / Manual / Guide by International Society for Pharmaceutical Engineering, 2012
-
ISPE Guide Series: Product Quality Lifecycle Implementation (PQLI) from Concept to Continual Improvement Part 3 – Change Management System as a Key Element of a Pharmaceutical Quality System
$410.00$246.00Add to cartHandbook / Manual / Guide by International Society for Pharmaceutical Engineering, 2012
-
ISPE Good Practice Guide: Packaging, Labeling, and Warehousing Facilities
$460.00$276.00Add to cartHandbook / Manual / Guide by International Society for Pharmaceutical Engineering, 05/01/2012
-
ISPE Good Practice Guide: Assessing the Particulate Containment Performance of Pharmaceutical Equipment
$460.00$276.00Add to cartHandbook / Manual / Guide by International Society for Pharmaceutical Engineering, 05/01/2012