Category
Sale!
API TR 934-J – Inspection, Assessment, and Repair of Coke Drums and Peripheral Components in Delayed Coking Units
This document includes information and guidance on the practices used by industry practitioners on the inspection, assessment, and repair of coke drums and peripheral components in delayed coking units. The guidance is general and does not reflect specific details associated with a design
offered by licensors of delayed coking technology or inspection tools, repair techniques, and/or engineering assessments offered by contractors.
Product Details
- Published:
- 09/01/2021
- Number of Pages:
- 94
- File Size:
- 1 file , 5.5 MB
- Product Code(s):
- C934J01, C934J01, C934J01
- Note:
- This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
Category: API
Related products
-
API TR 7CR
$75.00$45.00Add to cartCold Working Thread Roots with CNC Lathes for Rotary Shouldered Connections, First Edition
Published by Publication Date Number of Pages API 01/01/2020 49 -
API TR 942-B
$187.00$112.20Add to cartMaterials, Fabrication, and Repair Considerations for Austenitic Alloys Subject to Embrittlement and Cracking in High Temperature 565 degrees C to 760 degrees C (1050 degrees F to 1400 degrees F) Refinery Services, First Edition.
Published by Publication Date Number of Pages API 05/01/2017 88 -
API TR 932-A
$164.00$98.40Add to cartA Study of Corrosion in Hydroprocess Reactor Effluent Air Cooler SystemsAPI Publication 932-A, A Study of Corrosion in Hydroprocess Reactor Effluent Air Cooler Systems
Published by Publication Date Number of Pages API 09/01/2002 49 -
API TR 934-F Part 4
$195.00$117.00Add to cartThe Effects of Hydrogen for Establishing a Minimum Pressurization Temperature (MPT) for Heavy Wall Steel Reactor Vessels, First Edition
Published by Publication Date Number of Pages API 11/01/2018 112