Category
Recently Viewed Products
-
IEST G-CC1004
$165.00$99.00 -
CISPR 20 Ed. 6.0 b
$352.00$211.20 -
AWS D10.18M/D10.18
$79.00$47.40 -
AASHTO GVM-1
$96.00$57.60
AASHTO ABC-1
$270.00 $162.00
LRFD Guide Specifications for Accelerated Bridge Construction, 1st Edition
Published by | Publication Date | Number of Pages |
AASHTO | 2018 | 225 |
AASHTO ABC-1 – LRFD Guide Specifications for Accelerated Bridge Construction, 1st Edition
AASHTO ABC-1: Many state DOTs and the Federal Highway Administration are actively promoting accelerated bridge construction (ABC) to reduce traffic impacts, onsite construction time, environmental impacts, and life cycle costs; and to improve work zone safety, site constructability, material quality, and product durability, while replacing the nation’s transportation infrastructure. With ABC, prefabricated elements reduce or eliminate the onsite construction time that is needed to build a similar structural component using conventional construction methods. These guide specifications compile the growing body of recommended design and construction specifications for prefabricated bridge elements and systems for ABC with a focus on constructability and durability.
Product Details
- Published:
- 2018
- ISBN(s):
- 9781560517153
- Number of Pages:
- 225
- File Size:
- 1 file , 8.1 MB
- Note:
- This product is unavailable in Russia, Belarus
Related products
-
AASHTO VE-4
$20.00$12.00Add to cartGuidelines for Value Engineering, 4th Edition
Published by Publication Date Number of Pages AASHTO 2017 40 -
AASHTO UAAG-4
$13.00$7.80Add to cartUniform Audit and Accounting Guide for Audits of Architectural and Engineering (A/E) Consulting Firms, 2016 Edition
Published by Publication Date Number of Pages AASHTO 2016 172 -
AASHTO WMTD-1
$70.00$42.00Add to cartGuide to Wetland Mitigation Issues for Transportation Designers
Published by Publication Date Number of Pages AASHTO 01/01/1996 80 -
AASHTO TP 99
$97.00$58.20Add to cartStandard Method of Test for Determining the Influence of Road Surfaces on Traffic Noise Using the Continuous Flow Traffic Time-Integrated Method (CTIM)
Published by Publication Date Number of Pages AASHTO 2018 22